Indonesia Nickel HPAL and MHP Market Outlook 2027-2032: Capacity, Costs and Battery Supply Chain
Market Overview
Five years ago, high-pressure acid leaching (HPAL) in Indonesia was a single pilot-scale bet on Obi Island. Today it is the main reason the country matters to the battery industry, not just to stainless steel. HPAL plants dissolve low-grade limonite ore in sulphuric acid at high temperature and pressure and recover nickel and cobalt as mixed hydroxide precipitate (MHP), an intermediate that refiners in Indonesia and China turn into nickel sulphate and then into cathode precursor.
The scale-up has been fast. Mysteel puts Indonesian MHP output at 468,900 tonnes of contained nickel in 2025, slightly above the 445,000 tonnes of nameplate capacity it counted for the year, as plants ran hard through a period of tight ore and firm payables. Nine HPAL projects were operating in early 2026, and three to five more were expected to start during the year. If every scheduled start had happened on time, capacity would have reached 922,000 tonnes of nickel, roughly double the 2025 level. It has not worked out that way, and the gap between capacity and output is the central planning question.
The output estimate for 2026 has already been cut. Mysteel’s balanced view for the year moved down to a range of 480,000-520,000 tonnes of nickel after the first quarter brought three shocks at once: a much smaller ore quota, a fatal landslide at a tailings facility in the Morowali park, and a spike in sulphur prices linked to disruption in the Middle East. Even at the low end, MHP remains the fastest-growing nickel product in the country, and it already supplies about 60% of the feedstock for China’s nickel sulphate, by Mysteel’s calculation.
| Indicator | 2025 | 2026 (latest view) | Basis |
|---|---|---|---|
| MHP output, kt Ni | 468.9 | 480-520 (balanced) | Mysteel, Mar 2026 |
| Operating HPAL projects | 9 | XX | Mysteel, Q1 2026 |
| MHP capacity, kt Ni | XXX | XXX | ████ |
| Capacity utilisation, % | XX% | XX% | ████ |
| MHP market value, USD bn | X.X | X.X | ████ |
| Cobalt in MHP, kt | XX.X | XX.X | ████ |
Capacity and the HPAL Project Pipeline
Indonesian HPAL capacity is concentrated in two places. The first is the Indonesia Morowali Industrial Park (IMIP) in Central Sulawesi, where GEM, Huayou, Brunp and Nickel Industries run leaching plants. The second is Obi Island in North Maluku, home to Harita Nickel’s plants built with Lygend.
GEM is the largest single operator. Its four Morowali projects (QMB, Meiming, ESG and Green-Eco) have combined capacity of about 150,000 tonnes of nickel a year and produced 108,200 tonnes in 2025, close to 30% of national HPAL output. Harita’s listed arm, Trimegah Bangun Persada, sold 99,858 tonnes of nickel in MHP and nickel sulphate in the first nine months of 2025, up about 46% on the year. Nickel Industries produced its first MHP at the Excelsior Nickel Cobalt (ENC) plant in July 2026, a 72,000-tonne-a-year project fed by limonite slurry from its Hengjaya mine through a 22-kilometre pipeline.
| Project | Location | Main sponsors | Nameplate (t Ni/yr) | Status |
|---|---|---|---|---|
| GEM cluster (QMB, Meiming, ESG, Green-Eco) | IMIP, Morowali | GEM, Brunp (CATL), Tsingshan | ~150,000 | Operating |
| Excelsior Nickel Cobalt (ENC) | IMIP, Morowali | Nickel Industries, Shanghai Decent | 72,000+ | Ramp-up from Jul 2026 |
| Obi HPAL lines (HPL, ONC) | Obi, North Maluku | ██████ | XXX,XXX | ████ |
| Huayue / Huafei | Morowali / Weda Bay | ██████ | XXX,XXX | ████ |
| Pomalaa (IGP) | Southeast Sulawesi | ██████ | XXX,XXX | ████ |
| Morowali / Bahodopi | Central Sulawesi | ██████ | XXX,XXX | ████ |
| Sorowako limonite HPAL | South Sulawesi | ██████ | XXX,XXX | ████ |
| Merdeka (MBMA) / others | Morowali | ██████ | XXX,XXX | ████ |
The pipeline that follows is dominated by projects tied to PT Vale Indonesia and Huayou. GlobalData expects the Pomalaa plant, owned by Huayou, Vale and Ford, to start in the fourth quarter of 2026, with design output of about 120,000 tonnes of MHP a year. The Sorowako limonite plant with Huayou is due in the second quarter of 2027. Pomalaa alone needs about 21 million tonnes of limonite a year.
There is also a policy ceiling. Government Regulation 28/2025 stopped new permits for intermediate nickel smelters, including MHP plants, which means the projects already licensed form most of the capacity that can be built in this cycle. The licence list is a better guide to 2030 supply than new memoranda.
Ore Supply, Quotas and the New Price Rules
HPAL plants use limonite, the low-grade laterite layer that kiln smelters do not want, so the ore used to be cheap. Two changes in 2026 ended that.
The first was the mining quota. Under the annual RKAB work-plan system, which reverted from three-year to one-year approvals for 2026, the energy ministry initially signalled 260-270 million tonnes of nickel ore for 2026, down by more than 30% from about 379 million tonnes in 2025, against smelter demand that the smelter association FINI put at 340-350 million tonnes. Approvals were later raised, and by late October 2026 the ministry said all revised 2026 approvals had been issued at around 300 million tonnes. Vale Indonesia, which feeds several HPAL partners, received a 2026 quota of roughly 30% of what it asked for, according to GlobalData.
The second change was price. From 15 April 2026, the benchmark mineral price (HPM) formula was revised so that limonite is valued much closer to its nickel content and cobalt became a priced by-product. SMM estimated the new floor for 1.2% nickel ore at about USD 40 per wet tonne, against roughly USD 16 under the old formula, and calculated that MHP made from purchased ore would cost about USD 2,600 more per tonne of nickel. Integrated producers with captive mines feel this less.
| Ore and policy item | Before | After (2026) | Effect on HPAL |
|---|---|---|---|
| RKAB ore quota, Mt | ~379 (2025) | ~300 (revised 2026) | Tighter feed; more imports |
| HPM floor, 1.2% Ni limonite, USD/wmt | ~16 | ~40 (SMM est.) | Higher cost for non-integrated plants |
| Royalty on nickel ore | XX% | XX-XX% | ████ |
| Royalty on MHP | X% | X% | ████ |
| Philippine ore imports, Mt | XX | XX | ████ |
Costs: Ore, Sulphur, Acid and Payables
An HPAL plant is a chemical plant attached to a mine: its main variable costs are ore, sulphur for acid and steam, limestone, power and reagents. When Indonesian producers scaled up, all of these were cheap at once.
That advantage narrowed in 2026. Indonesia imported 5.35 million tonnes of sulphur in 2025, more than three-quarters of it from the Middle East, and the share is higher still for the Morowali park. Nickel Industries said it paid about USD 250 a tonne for sulphur before prices passed USD 1,000, and that its stockpile, bought at an average of USD 450, would last to the end of September 2026. An MBMA executive told Petromindo that acid, the second-largest HPAL cost item, had gone from about USD 40 to USD 100 a tonne. Combined with the higher ore floor, those moves explain why S&P Global reported in April 2026 that nickel batteries risked losing ground to LFP on cost.
The revenue side moved in producers’ favour. MHP is priced as a percentage (the payable) of the LME nickel price. S&P Global data show MHP payables averaging about 79.6% in 2023-2025, then rising to about 92.5% by late April 2026 as Chinese refiners competed for scarce material. Higher payables have protected margins at integrated plants.
Where the MHP Goes: The Battery Supply Chain
Almost all Indonesian MHP ends up as nickel sulphate, either in China or in refineries now being built next to the leaching plants. The chain runs from limonite ore, to MHP, to nickel and cobalt sulphate, to precursor (pCAM), to cathode active material and finally to cells. Indonesia has the first two steps at scale, a growing share of the third, and only early-stage capacity in the rest.
- Export MHP: the largest volume still ships to Chinese refiners owned by or contracted with the same groups that run the leaching plants (GEM, Huayou, CATL/Brunp, Lygend).
- In-park refining: several plants now make nickel sulphate or cathode on site; Nickel Industries expected first nickel cathode from ENC in August 2026.
- Downstream projects: precursor and cell plants linked to the Indonesia Battery Corporation and Korean and Chinese partners are the government’s target for the next phase.
- Cobalt: Indonesia produced 49,300 tonnes of cobalt in 2025, almost all inside MHP (GlobalData).
For the vehicle and cell side of the story, see our report on Electric Vehicle and Battery in Indonesia; for land and estate options for processing plants, see Indonesia Industrial Estate and Ready-Built Factory Market.
Tailings, ESG and Operating Risk
HPAL produces large volumes of fine, acidic tailings, and the sites in Sulawesi and Maluku sit in high-rainfall, seismically active areas where deep-sea disposal is not permitted. Producers have moved to dry-stacked tailings, which take a lot of land and careful engineering. The risk became concrete on 18 February 2026, when a landslide at the tailings facility shared by GEM’s four Morowali plants killed one worker. All four plants stopped for maintenance on 9 March, and Mysteel estimated the direct loss at 12,000-20,000 tonnes of nickel for the year.
Tailings are now a gating factor for capacity, not just an ESG footnote. Expansion approvals now depend on credible storage plans, and Western buyers want third-party audits before signing offtake. Captive coal power is the other weak point for buyers facing carbon-footprint rules.
Competitive Landscape
The Indonesian HPAL market is concentrated in a few Chinese-led groups and their Indonesian partners. GEM, Huayou and Lygend-Harita together account for the majority of operating capacity, with Nickel Industries, Merdeka Battery Materials and the Vale-Huayou joint ventures adding share over the forecast period. Most MHP is committed to the sponsors’ own refineries, so the spot market is smaller than output suggests.
| Company | Listed? | Indonesian HPAL role | Est. share of 2025 output |
|---|---|---|---|
| GEM Co. | Yes (Shenzhen) | Operator, QMB cluster, Morowali | ~30% (Mysteel) |
| Harita Nickel (Trimegah Bangun Persada) | Yes (IDX: NCKL) | Obi HPAL with Lygend | XX% |
| Zhejiang Huayou Cobalt | ████ | ██████ | XX% |
| Nickel Industries | ████ | ██████ | XX% |
| Merdeka Battery Materials (MBMA) | ████ | ██████ | XX% |
| PT Vale Indonesia | ████ | ██████ | XX% |
What This Means for Buyers, Investors and Suppliers
- Cathode and precursor makers should plan on Indonesian MHP supply growing more slowly than headline capacity, and lock in offtake with integrated producers that own ore and acid capacity.
- Investors should screen projects on ore self-sufficiency, sulphur sourcing, tailings capacity and captive power, which now drive cost differences more than plant size.
- Equipment and reagent suppliers face a steady pipeline tied to licensed projects.
- Policy watchers should track the 2027 RKAB quota, the PP 19/2025 royalty amendment and any further HPM changes, which together set the margin for the next five years.
Key Questions Answered in the Full Report
- How much MHP will Indonesia produce each year from 2027 to 2032, under bear, base and bull scenarios?
- What is the cash cost of HPAL nickel in Indonesia after the 2026 HPM and royalty changes?
- Which companies run HPAL plants in Indonesia, and how much capacity does each control?
- How tight will limonite ore and sulphur supply be, and what does that mean for utilisation?
- How much MHP will be refined into nickel sulphate, precursor and cathode inside Indonesia?
- How do tailings, carbon intensity and US trade rules affect offtake and financing?
Indonesia Nickel HPAL and MHP Market Outlook 2027-2032: Capacity, Costs and Battery Supply Chain Executive Summary
The three slides below summarise the full report. The complete 42-slide version, with the outlook to 2032, regulation, cost curve, value chain and company profiles, is available on request.
- MHP is the fastest-growing Indonesian nickel product.
- Output already supplies most of China’s sulphate feed.
- 2026 output cut by quota, tailings and sulphur shocks.
- Quotas now issued yearly.
- Sulphur and acid costs doubled or more.
- High payables protect integrated producers.
- Licensed projects set the capacity ceiling.
- Tailings capacity becomes a gating factor.
- More MHP refined into sulphate and cathode on site.
Report Preview
What the Full Report Includes
- MHP output, capacity and utilisation, 2021-2025, 2026 estimate and plant-level pipeline
- Market value of MHP (nickel and cobalt payables) and price assumptions
- Regulation: RKAB quotas, HPM benchmark pricing, PP 19/2025 royalties, PP 28/2025 smelter permit freeze, export rules
- HPAL production process and supply chain, from limonite to cathode
- Cost build-up: ore, sulphur, acid, limestone, power, and integrated vs non-integrated plants
- Porter's Five Forces and key mega trends
- Drivers, restraints and impact assessment
- Market landscape and estimated shares by operator group
- Profiles: GEM, Harita Nickel, Huayou, Nickel Industries and Merdeka Battery Materials
- Bear, base and bull forecasts to 2032 for output, capacity, value and cobalt