Indonesia Commercial and Industrial Rooftop Solar Market 2027-2032: Regulation, Tariffs and EPC Players

JakartaMarketLab | Research Division

Indonesia Commercial and Industrial Rooftop Solar Market 2027-2032: Regulation, Tariffs and EPC Players

How the 2024 rooftop solar rules, PLN quotas and industrial power tariffs shape the business case for solar on Indonesian factory and warehouse roofs, and which developers and EPC contractors are winning the projects.
Date: November 2026
Base Year: 2025
Forecast Period: 2027-2032
Geography: Indonesia
Pages: 42 slides
Indonesia commercial and industrial rooftop solar illustration: factory roof with solar panels, inverter and grid tower
861 MWp
Rooftop solar on PLN customers, March 2026 (11,840 customers)
485 MW
Rooftop quota offered in the January 2026 window
Rp 1,122
PLN I-3 industrial tariff per kWh, Q3 2026
22.5 MWp
Largest single rooftop system, Cikarang (2026)
XX.X%
2027-2032 forecast CAGR, C&I rooftop capacity

Market Overview

Indonesia has some of the best solar resources in Asia and one of the region's smallest rooftop solar markets. That gap is the whole story of commercial and industrial (C&I) rooftop solar in the country. Factories, warehouses, cold stores and malls have the roof space, the daytime load and, increasingly, the pressure from export customers to cut Scope 2 emissions. What they have not had is a regulatory framework that makes the investment easy. Since 2024 the rules have changed again, and the market that is emerging looks very different from the household-led model that earlier policy tried to build.

The scale is still modest. According to PLN, customers connected to its grid had 861.14 MWp of rooftop solar modules installed by March 2026, spread across 11,840 customers. Total installed solar in the country, including ground-mounted and floating plants, was put at about 1.49 GW at the end of 2025 after roughly 546 MW was added during the year, most of it on C&I rooftops. For comparison, IEEFA puts Vietnam's rooftop fleet at about 6.9 GW and Thailand's at about 3.6 GW. Indonesia, with a far larger industrial base, is several years behind both.

Grid-connected rooftop solar (PLTS Atap) on PLN customers, cumulative installed capacity (MWp)
538 MWp
Jul 2025
XXX
Nov 2025
861 MWp
Mar 2026
Source: Ministry of Energy and Mineral Resources via Kontan (July 2025); PLN via Jakarta Post and Katadata (November 2025) and Jakarta Globe (March 2026). Earlier years and the C&I share of capacity are shown in the full report.

The growth is real, though. Capacity on PLN customer roofs rose by more than 300 MWp in the eight months to March 2026, and the Jakarta Post reported that the rooftop base had grown more than 500-fold since 2018. Almost all of the recent additions are commercial and industrial. Household uptake slowed sharply once net metering was removed, while factories kept signing because their economics never depended on exporting power in the first place.

IndicatorValueBasis / date
Rooftop solar on PLN customers (modules)861.14 MWpPLN, March 2026
Rooftop solar customers11,840PLN, March 2026
C&I share of installed rooftop capacityXX%████
Average C&I system size (kWp)XXX████
Installed EPC cost, C&I (USD/Wp)X.XX-X.XX████
Self-consumption share of outputXX%████
Source: PLN (first two rows). Remaining rows: Results of extrapolation/triangulation using MEMR, PLN, IESR and developer data and other sources, adjusted for differences in module (MWp) and inverter (MW) capacity reporting.

A note on reading the data. Indonesian sources mix three different things: module capacity in MWp, inverter capacity in MW, and total solar capacity including utility-scale plants. PLN's March 2026 figures show the gap clearly: 861 MWp of modules sit behind only 768 MW of inverters. IEEFA quotes 853 MW for 2025, the Energy Ministry quoted 773 MW for November 2025, and the 1.49 GW national figure includes ground-mounted projects. All of them can be correct at the same time. Anyone building a feasibility study should first decide which one they need.

How many megawatts of C&I rooftop solar will Indonesia install each year from 2027 to 2032?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

The Rulebook: Permen ESDM 2/2024 and the Quota System

The single most important document for this market is Energy Ministry Regulation No. 2 of 2024 on rooftop solar connected to PLN's grid. It replaced the 2021 rule and changed three things at once.

  • Net metering ended. Power exported to the grid is no longer credited against the customer's bill. A rooftop system now pays back only through the electricity it displaces on site, which favours customers with steady daytime load.
  • Quotas replaced open access. PLN must publish a five-year rooftop quota for each electricity system, and applications are accepted only in two windows a year, in January and July. For 2024-2028 the quotas were set at 901 MW, 1,004 MW, 1,065 MW, 1,183 MW and 1,593 MW, distributed across 11 clusters.
  • Capacity charges for industry were dropped. Industrial customers no longer pay the parallel-operation capacity charge that made the old rules unattractive, and the size limit tied to the customer's PLN connection was replaced by the quota.

In practice the quota is the binding constraint. In the January 2026 window PLN offered 485 MW. Of that, 304 MW went to customers already on the waiting list, so only about 183 MW was open to new applicants, and it was taken up quickly. The Energy Ministry proposed adding 400 MW for 2026, and in July PLN put forward an extra 229 MW, with an executive conceding that even this was not enough. Bali's governor publicly asked PLN to lift the limits altogether.

YearPLN rooftop quota (MW)Applications received (MW)Approved (MW)
2024901XXXXXX
20251,004XXXXXX
2026X,XXXXXXXXX
2027X,XXX████████
2028X,XXX████████
Source: Permen ESDM 2/2024 and DG Electricity Decree 279.K/TL.03/DJL.2/2024 via Tanahair and PV Tech (2024 and 2025 quotas). Other rows: Results of extrapolation/triangulation using MEMR, PLN, IESR and developer data and other sources, adjusted for differences in module (MWp) and inverter (MW) capacity reporting.

Two other rule sets matter. The first is local content. Indonesia's TKDN rules historically required a high domestic share in solar modules, which raised costs because locally assembled modules sold at a 30-40% premium to imports. The Industry Ministry has since eased those rules, and the 2025 local content regulation recasts TKDN more as an incentive than a hard barrier, but EPC contractors still need to check which projects fall under the requirement. The second is the separate track for captive solar inside industrial estates and private power areas (wilus), which IESR says has tripled since 2017 and is not subject to PLN's rooftop quota at all.

Which provinces and PLN systems have spare rooftop quota, and how long is the queue?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

Tariffs and the Business Case

Without net metering, the value of a C&I rooftop system is the PLN tariff it avoids. That tariff is low by regional standards. In the third quarter of 2026 PLN charged Rp 1,122 per kWh for medium-voltage industrial customers above 200 kVA (class I-3) and Rp 997 per kWh for high-voltage customers at 30,000 kVA and above (I-4). The government has held these non-subsidised tariffs flat for several consecutive quarters, even though the parameters used in the formula, including an exchange rate near Rp 16,959 per US dollar, would justify an increase.

PLN tariff classVoltage / connectionQ3 2026 tariff (Rp/kWh)Implied C&I solar payback
I-3 industrialMedium voltage, >200 kVA1,122X-X years
I-4 industrialHigh voltage, ≥30,000 kVA997X-X years
B-3 commercialMedium voltage, >200 kVAX,XXXX-X years
P-2 government / publicMedium voltage, >200 kVAX,XXX████
Source: Ministry of Energy and Mineral Resources via CNBC Indonesia (3 August 2026) for I-3 and I-4 tariffs. Payback ranges: Results of extrapolation/triangulation using MEMR, PLN, IESR and developer data and other sources, adjusted for differences in module (MWp) and inverter (MW) capacity reporting.

At around 6-7 US cents per kWh, the avoided cost is lower than in Vietnam or the Philippines, which is why earlier studies put C&I rooftop returns in Indonesia well below what investors expect. Rystad Energy, cited by PV Tech in 2024, estimated C&I rooftop IRRs of only 3-5% under older cost assumptions. What has changed is the cost side. Module prices fell steeply in 2023-2025, installation teams have scaled up, and developers now offer leases and power purchase agreements that move the capital cost off the customer's balance sheet entirely. For a plant running two or three shifts, with high daytime load and a corporate carbon target, the case now usually stands up without subsidies.

It also helps that grid reliability has become a board-level topic. IEEFA pointed to the 22 May 2026 Sumatra blackout and the rolling outages on the Java-Madura-Bali grid that followed as evidence that on-site generation has value beyond the tariff. Solar paired with batteries is increasingly sold as resilience, not just savings.

Levelised cost of C&I rooftop solar vs PLN tariff by class, 2025 (Rp/kWh)
🔒 In the full report
At what tariff and system cost does a C&I rooftop project in Indonesia reach a 12-15% IRR?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

Business Models: Capex, Lease and Zero-Capex PPA

Three commercial models dominate. Under a straight capex (EPC) purchase, the factory owner pays for the system and keeps all the savings. Large conglomerates and state-owned enterprises with cheap capital still prefer this. Under an operating lease, a developer owns the system and charges a fixed monthly fee. Under a zero-capex solar PPA, the developer finances, builds and runs the plant and sells the power to the host at a discount to the PLN tariff, typically over 15 to 25 years.

The zero-capex model is now the growth engine. TotalEnergies ENEOS's 3.6 MWp project at chocolate maker Ceres in Bandung, for example, runs on a 15-year agreement in which Ceres pays only for the electricity produced. Xurya's 22.5 MWp system at the Mulia glass complex in Cikarang, which went live in April 2026 and covers more than 122,000 square metres of roof with 36,862 panels, is the country's largest rooftop installation. The model works well for multinationals with RE100 commitments that would rather not put solar on their own books.

ModelWho owns the assetTypical contractMain buyers
Capex / EPC purchaseHost companyOne-off EPC + O&MConglomerates, SOEs
Zero-capex PPADeveloper / IPP15-25 year PPA, discount to PLN tariffMultinationals, exporters
Operating lease████████████
Hybrid solar + BESS████████████
Source: TotalEnergies ENEOS / Ceres via SolarQuarter (June 2026); Xurya / Mulia via Jakarta Globe (April 2026); JakartaMarketLab analysis.

One friction point is contract length. IEEFA notes that energy service company rental contracts are limited to five years, while typical paybacks are 7-12 years, a mismatch that pushes developers towards longer PPA structures and adds legal complexity. The full report sets out how each model handles quota risk, PLN connection approval and end-of-contract transfer.

What PPA discount to the PLN tariff are developers offering in 2026, and how is it changing?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

Developers and EPC Players

The market is led by a handful of specialised developers that grew up after 2018, joined more recently by international energy companies and PLN's own subsidiary. SUN Energy reported 200 MW of operating rooftop capacity in August 2025 across more than 300 projects in 20 provinces, with clients including Unilever, Ajinomoto, Astra Group and LamiPak, and its group portfolio was close to 400 MW by the end of 2025, of which about 250 MW in Indonesia. Xurya, backed by ACV Capital, had completed more than 300 projects and over 200 MWp by the end of 2025 under its zero-capex model.

CompanyTypeModelIndonesia portfolio
SUN EnergyDeveloper / EPCPPA, lease, EPC~250 MW (Dec 2025)
Xurya Daya IndonesiaDeveloperZero-capex PPA / lease>200 MWp, 300+ projects
TotalEnergies ENEOS████████XXX MWp
PLN Icon Plus████████XXX MWp
iForte (Protelindo group)████████XXX MWp
Other EPCs and module makers████████XXX MWp
Source: SUN Energy via Jakarta Globe (August 2025) and Fortune Indonesia (December 2025); Xurya via SolarQuarter (April 2026). Other rows and market shares in the full report.

Below the developers sits a larger tier of EPC contractors, inverter distributors and module makers. Domestic module capacity was estimated at about 11.7 GWp a year in 2025, much of it newly built by Chinese manufacturers aiming at the US export market rather than at local rooftops. That overcapacity is a quiet advantage for Indonesian C&I buyers: it keeps local module prices under pressure and makes TKDN-compliant supply easier to find. Telecom tower firm iForte's 6.3 MWp hybrid solar and battery project with steel pipe maker Spindo shows how new entrants from adjacent infrastructure businesses are moving in.

C&I rooftop developer market share by operating capacity, 2025 (%)
🔒 In the full report
Which developers and EPC contractors will hold the largest share of new C&I rooftop capacity by 2032?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

Demand Drivers: Who Is Buying

  • Export manufacturers in textiles, footwear, packaging, food and automotive parts face customer carbon requirements and, for some sectors, the EU's Carbon Border Adjustment Mechanism.
  • Multinational FMCG and food companies with RE100 or net-zero targets were the first adopters and remain the anchor customers. IEEFA counts more than 130 companies in Indonesia that have pledged to source 100% renewable power.
  • Industrial estates and ready-built factory landlords are adding solar as an amenity, which links this market to our Indonesia industrial estate and ready-built factory report.
  • Data centres and cold chain operators want on-site generation and storage for resilience; see our Data Center in Indonesia review.
  • EV and battery supply chain plants are under pressure to show low-carbon electricity, a theme covered in Electric Vehicle and Battery in Indonesia.

The policy direction is supportive on paper. PLN's 2025-2034 business plan allocates 3,037 MW to new rooftop installations, and the government's wider ambition of 100 GW of solar, much of it as village-level and distributed systems, keeps solar at the centre of the energy debate. The question for C&I buyers is not whether policy favours solar, but whether PLN will release enough quota fast enough on the systems where factories actually sit.

C&I rooftop capacity by end-user industry, 2025 (MWp)
🔒 In the full report
Which industries and provinces will generate the most C&I rooftop demand from 2027 to 2032?
The full report answers this with complete tables, year-by-year data, charts and analyst commentary, plus outlook scenarios to 2032.
Request the full report

What This Means for Buyers, Developers and Investors

  • Factory owners should apply in the January or July window as early as possible and size systems for self-consumption, since exported power earns nothing.
  • Developers and EPC firms will compete less on module price and more on quota access, financing cost and the ability to bundle batteries and energy management.
  • Investors should treat PLN quota allocation as the main volume risk and the industrial tariff path as the main price risk.
  • Regional comparisons matter: the economics look very different in Malaysia's market, covered in our Malaysia data center cooling and power equipment report, and in Vietnam or Thailand.

Key Questions Answered in the Full Report

  1. How many MWp of C&I rooftop solar will Indonesia install each year from 2027 to 2032, under bear, base and bull scenarios?
  2. How much rooftop quota does each PLN system have, and how quickly is it being used?
  3. What are installed EPC costs, PPA tariffs and paybacks for C&I systems in 2025-2026?
  4. Which industries and provinces account for most C&I rooftop demand?
  5. Who are the leading developers and EPC contractors, and what are their market shares?
  6. How will battery storage, TKDN rules and the 100 GW solar programme change the market?
See the answers in the full report

Indonesia Commercial and Industrial Rooftop Solar Market 2027-2032: Regulation, Tariffs and EPC Players Executive Summary

The three slides below summarise the full report. The complete 42-slide version, with the outlook to 2032, regulation, value chain and company profiles, is available on request.

Executive Summary · 1 / 3 · Headline numbers
Indonesia C&I Rooftop Solar Market Executive Summary
861 MWp
Rooftop solar on PLN customers, Mar 2026
████
C&I share of capacity
████
C&I market value 2025
████
2027-2032 CAGR
  • Rooftop capacity is growing fast from a small base.
  • C&I now drives almost all new additions.
  • Indonesia trails Vietnam and Thailand by several gigawatts.
JakartaMarketLab · www.jakartamarketlab.comSource: JML estimates (triangulated from MEMR, PLN, IESR, IEEFA, developer disclosures)
Executive Summary · 2 / 3 · Regulation and tariffs
Quotas, not demand, set the pace
485 MW
Jan 2026 quota window
████
Queue backlog
████
C&I EPC cost / Wp
████
Typical PPA discount
  • Net metering ended under Permen ESDM 2/2024.
  • Two application windows a year, by PLN system.
  • Low, frozen industrial tariffs keep margins thin.
JakartaMarketLab · www.jakartamarketlab.comSource: JML estimates (triangulated from MEMR, PLN, IESR, IEEFA, developer disclosures)
Executive Summary · 3 / 3 · Outlook
Zero-capex PPAs and batteries lead the next phase
████
C&I capacity 2032 (base)
████
Annual additions 2032
████
Top-5 developer share
████
Solar + BESS share
  • Developers compete on quota access and finance.
  • Batteries turn solar into a resilience product.
  • Captive estate solar grows outside the quota.
JakartaMarketLab · www.jakartamarketlab.comSource: JML estimates (triangulated from MEMR, PLN, IESR, IEEFA, developer disclosures)

Report Preview

C&I rooftop MWp, 2019-2032
🔒 In the full report
Quota by PLN system
🔒 In the full report
Porter's Five Forces
🔒 In the full report
Developer profiles (top 5)
🔒 In the full report
Who this report is for
Solar developers, EPC contractors and IPPs entering Indonesia, module and inverter suppliers, manufacturers and industrial estate operators evaluating rooftop solar, energy and ESG managers, and investors and lenders in distributed energy.
Method: secondary research and data triangulation across MEMR and PLN statistics, think-tank research, developer disclosures and trade press. Base year 2025, estimate 2026, forecasts 2027-2032. Published November 2026.
Request the full report

What the Full Report Includes

This 42-slide report is written for developers, EPC contractors, suppliers, manufacturers and investors evaluating commercial and industrial rooftop solar in Indonesia.
  • Rooftop and C&I solar capacity, 2019-2025 and 2026 estimate, in MWp and market value
  • Permen ESDM 2/2024, quota system, application windows, TKDN and captive power rules
  • PLN tariff classes, avoided cost and project economics
  • Business models: EPC, lease, zero-capex PPA and solar plus storage
  • Project development process and supply chain
  • Value chain, Porter's Five Forces and key mega trends
  • Drivers, restraints and impact assessment
  • Market landscape, segmentation by industry and region, and market shares
  • Profiles: SUN Energy, Xurya, TotalEnergies ENEOS, PLN Icon Plus and one more leading player
  • Bear, base and bull forecasts to 2032
Get the Full Report
Indonesia Commercial and Industrial Rooftop Solar Market 2027-2032: Regulation, Tariffs and EPC Players. 42 slides, PDF.
Request the Full Report
Sources
Ministry of Energy and Mineral Resources via Kontan (September 2025) and CNBC Indonesia (August 2026, PLN tariffs); PLN via The Jakarta Post (January 2026), Katadata (July 2026) and Jakarta Globe (April 2026); Tanahair and PV Tech (Permen ESDM 2/2024 quotas, 2024); IEEFA, "Indonesia's blackouts expose need for rooftop solar" (June 2026); SMM / pv magazine (2025 solar additions, February 2026); IESR via Kontan (captive solar, module capacity); SolarQuarter (Xurya, April 2026; TotalEnergies ENEOS and Ceres, June 2026; iForte and Spindo, February 2026); Jakarta Globe (SUN Energy, August 2025); Fortune Indonesia (SUN Energy, December 2025); Reccessary and law-firm briefings (TKDN rules).
This article is a promotional summary of a market research report published by JakartaMarketLab. Selected statistics are shown for indicative purposes only. Figures marked as triangulated are JakartaMarketLab estimates and may differ from other published sources. This article is not investment advice.
© 2026 JakartaMarketLab Market Intelligence | www.jakartamarketlab.com | risetlokal@gmail.com
Free sample: 6 pages of the full report
Cover, table of contents, methodology, executive summary and one company profile. Free, sent to your email.
Request the free sample