Cambodia Cement and Building Materials Market 2027-2032: Kampot Capacity, Chinese Investors and Construction Recovery
Market Overview
Cambodia's cement industry is young. Until Kampot Cement started commercial production in 2006-2007, every tonne used on a Phnom Penh tower or a provincial road came in by truck or barge from Thailand, Vietnam, Indonesia or the Philippines. Two decades later the picture has flipped. The Ministry of Mines and Energy counts six integrated plants with combined capacity of about 11 million tonnes a year and cumulative investment of roughly USD 1.11 billion, and Cambodia shipped its first cement exports, a little over 30,000 tonnes to Thailand, in 2024.
Demand has not kept up with the kilns. The Cambodia Cement Manufacturers Association (CCMA) reported output of 6.84 million tonnes in the first ten months of 2024, only about 2% more than a year earlier, and its members say they supply something like 8-9 million tonnes a year to the domestic market. Ex-works prices slipped to USD 90-100 per tonne in 2024, a few dollars below 2023. Put plainly, Cambodia now has more cement capacity than it can sell at home, and more is coming: a third Conch-linked line opened in Kampong Speu in May 2025 and the Council for the Development of Cambodia (CDC) licensed a 1 million-tonne plant in Kratie in January 2026.
Building materials beyond cement tell a different story because most of them are still imported. Iron and steel imports topped USD 631 million in 2024, up almost 70% on 2023, and the Ministry of Commerce recorded USD 2.36 billion of construction-material imports in the first eleven months of 2025, up 31% on the same period of 2024. That gap between a self-sufficient cement industry and an import-dependent steel, tile, glass and fittings supply chain is the central feature of this market.
| Indicator | Value | Period | Basis |
|---|---|---|---|
| Installed cement capacity | ~11 Mt/yr | 2025 | Six operating plants |
| Cement output | 6.84 Mt | Jan-Oct 2024 | CCMA |
| Domestic cement consumption | X.X Mt | ████ | ████ |
| Capacity utilisation | XX% | ████ | ████ |
| Cement exports | XX kt | ████ | ████ |
| Cement market value (ex-works) | USD XXX m | ████ | ████ |
A note on the numbers. Published capacity figures for Cambodia range from about 11 to 14 million tonnes a year depending on whether the source counts nameplate clinker capacity, grinding capacity or plants that are licensed but not yet running, and the factory count moves between five and seven for the same reason. The full report reconciles these into one plant-by-plant capacity table and uses it for every utilisation and forecast figure.
Kampot and the New Cement Map
Kampot province is the historic heart of the industry because it has the limestone. The coastal karst hills between Kampot town and the Vietnamese border host Kampot Cement, majority owned by Thailand's Siam Cement Group (SCG) and still the largest single plant at about 2 million tonnes a year; Chip Mong Insee Cement, a USD 262 million joint venture between Cambodia's Chip Mong Group and Siam City Cement that opened in 2018; Thai Boon Roong's integrated plant in its own La'ang special economic zone; and the Cambodia Cement Chakrey Ting plant, in which China's Huaxin Cement bought a 40% stake in 2015.
Since 2018 the growth has come from outside Kampot. Battambang Conch Cement, a Cambodian-Chinese venture tied to Anhui Conch, brought a 5,000-tonne-a-day line to the north-west near the Thai border. In May 2025 Prime Minister Hun Manet inaugurated Conch KT Cement's USD 250 million, 2.2 million-tonne plant on 407 hectares in Oral district, Kampong Speu, close to the Phnom Penh market. The licensed Kratie plant, with registered capital of USD 286 million, would open the north-east and the Mekong corridor.
| Plant | Province | Main shareholders | Capacity (Mt/yr) | Start |
|---|---|---|---|---|
| Kampot Cement | Kampot | SCG (Thailand) | ~2.0 | 2007 |
| Conch KT Cement | Kampong Speu | Conch (China) + Cambodian partner | ~2.2 | 2025 |
| Chip Mong Insee Cement | Kampot | ██████ | X.X | ████ |
| Battambang Conch Cement | Battambang | ██████ | X.X | ████ |
| Thai Boon Roong Cement | Kampot | ██████ | X.X | ████ |
| Cambodia Cement Chakrey Ting | Kampot | ██████ | X.X | ████ |
| Kratie plant (licensed) | Kratie | ██████ | X.X | ████ |
Ownership is the second story. Thai capital built the first wave: SCG, Siam City Cement and Thai Boon Roong. Chinese capital has built most of the second, through Conch and Huaxin. With the Kampong Speu line running and the Kratie plant on the way, Chinese-linked groups are on course to control a larger share of installed capacity than Thai-linked groups for the first time, which matters for pricing behaviour, for the clinker trade with southern China and for how the industry lobbies Phnom Penh.
Construction Demand: A Recovery With Two Speeds
On paper, construction is back. The Ministry of Land Management, Urban Planning and Construction approved 3,503 projects worth USD 7.32 billion in 2025, up almost 69% on 2024, with more than 18 million square metres of floor area. Factories, hotels, commercial buildings and more than 2,700 residential buildings were all in the mix. The CDC, which approves larger investment projects across all sectors, cleared about USD 10 billion in 2025 and another USD 4.7 billion in the first half of 2026, led by manufacturing and Chinese investors.
On the ground the recovery is slower. The National Bank of Cambodia (NBC) puts construction output in 2025 at only about 88% of its 2019 level and real estate at 84% of pre-pandemic activity. The World Bank cut its 2025 growth estimate for the whole economy to 4.8%, down from 6% in 2024, citing a soft property market, the border conflict with Thailand and higher US tariffs. Knight Frank's H2 2025 review found Phnom Penh condominium sales rates of around 3-4% of stock and landed-housing absorption of 2-3%, both far below historic norms.
| Demand segment | Share of cement use | 2025 direction | Key driver |
|---|---|---|---|
| Residential (borey, shophouses, self-build) | Largest | Flat to weak | Household credit, remittances |
| Factories and industrial buildings | Rising | Up | Manufacturing FDI, SEZs |
| Condominiums and high-rise | XX% | ████ | ████ |
| Roads, bridges, expressways | XX% | ████ | ████ |
| Airports, ports, canals | XX% | ████ | ████ |
| Commercial, hotels, retail | XX% | ████ | ████ |
Two things explain the gap between approvals and output. First, an approval is a permit, not a pour: many of the 2025 residential approvals are small private houses that will be built over several years, and some large mixed-use towers approved before 2020 are still stalled. Second, the mix has moved towards factories and logistics buildings, which use more steel and precast concrete per dollar than the condominium towers that drove demand in 2015-2019. Both effects mean cement volumes lag the headline investment figures.
Public Works and the Infrastructure Pipeline
The steadier source of demand is public and quasi-public infrastructure. The government's Comprehensive Intermodal Transport and Logistics Master Plan 2023-2033 lists 174 projects worth about USD 36.6 billion. The largest pieces relevant to building materials are:
- Techo International Airport south of Phnom Penh, a project across more than 2,600 hectares of Kandal and Takeo whose construction spend had passed USD 1.3 billion by late 2024; it opened in 2025.
- Funan Techo Canal, a 180-kilometre waterway linking the Mekong near Phnom Penh to the Gulf of Thailand coast near Kep, budgeted at about USD 1.7 billion with a 2028 target. Funding has been questioned since groundbreaking in August 2024, so it is a swing factor rather than a certainty.
- Expressways following the Phnom Penh-Sihanoukville toll road, including the Phnom Penh-Bavet route towards Vietnam and planned links to Siem Reap and Poipet.
- Port and SEZ expansion at Sihanoukville and in the special economic zones along National Roads 3, 4 and 5.
For cement makers these projects matter in two ways: they add volume when private housing is flat, and their locations favour particular plants. Kampot and Kampong Speu are well placed for the canal, the airport and the southern corridor; Battambang serves the north-west and the Thai border; Kratie would serve the north-east and Mekong river projects.
Steel, Bricks and Other Building Materials
Outside cement, Cambodia is still mainly an importer. Iron and steel imports reached about USD 631 million in 2024, roughly 2% of the country's total imports, and rose again in 2025 as factory construction picked up. Rebar, wire rod, coated sheet and structural sections come mostly from Vietnam, China and Thailand. Ceramic tiles, sanitary ware, flat glass, aluminium profiles and electrical fittings follow the same pattern, which leaves contractors exposed to currency moves and regional price cycles.
| Material | Local production | Main import sources | 2025 import trend |
|---|---|---|---|
| Cement and clinker | Self-sufficient, small exports | Minor (Vietnam, Thailand) | Falling |
| Steel rebar and sections | Limited re-rolling | Vietnam, China, Thailand | Up strongly |
| Clay bricks and blocks | ████ | ████ | ████ |
| Ready-mix and precast concrete | ████ | ████ | ████ |
| Ceramic tiles and sanitary ware | ████ | ████ | ████ |
| Flat glass and aluminium | ████ | ████ | ████ |
Ready-mix concrete and precast are the most interesting growth niches. Phnom Penh's larger contractors increasingly buy ready-mix rather than mixing on site, and precast hollow-core slabs, piles and boundary walls are spreading through industrial parks and borey developments. Several cement producers have moved downstream into ready-mix to protect volume, and the full report profiles who supplies which segment.
Policy: Protecting a Young Industry
The government treats cement as a strategic industry and has used tax policy to defend it as capacity has outgrown demand. Specific-tax exemptions on domestically produced cement were introduced for an initial period and extended to the end of 2026; in June 2026 Prime Minister Hun Manet extended the incentive package by a further two years to the end of 2028 after meeting the CCMA. An inter-ministerial working group chaired by the Ministry of Economy and Finance is also reviewing environmental fund contributions, mining royalties and limestone supply.
- Licensing restraint. The Prime Minister asked the Ministry of Mines and Energy in 2025 to consider limiting new cement licences to avoid an oversupply that would push plants into losses. The Kratie licence shows that the door is not fully closed.
- Export push. Officials have asked producers to find new export markets, which puts Cambodian plants into competition with Vietnamese clinker exporters.
- Mining and environment. Limestone concessions, royalties and dust and emissions rules are tightening, raising the cost of new capacity.
- Investment law. Qualified Investment Project status under the 2021 Law on Investment gives new plants import-duty and profit-tax incentives, which is how the Kratie project was approved.
The full report sets out each measure, the agency responsible and its likely effect on prices and margins through 2032.
Competition and Pricing
With six plants and a domestic market smaller than installed capacity, competition is on price and distribution. Bagged cement through hardware shops and dealers still dominates outside Phnom Penh, while bulk cement to ready-mix plants and large contractors is the battleground in the capital. Brand loyalty is real among small builders, which helps the older Thai brands, but newer Chinese-linked plants have the scale and the location advantage near Phnom Penh.
Prices have drifted lower since 2023 as capacity rose. The next test comes as the Kratie plant and any further expansions come online while private housing stays weak. In that scenario the industry would rely on exports to Thailand and Laos, on clinker sales and on public works to keep kilns running, and margins would come under pressure for the least efficient plants.
| Competitive factor | Thai-linked producers | Chinese-linked producers |
|---|---|---|
| Brand strength in bagged retail | Strong | Building |
| Proximity to Phnom Penh | Moderate (Kampot) | High (Kampong Speu) |
| Estimated capacity share 2025 | XX% | XX% |
| Cost position (USD/t) | XX | XX |
What This Means for Suppliers and Investors
- Equipment and service suppliers should look at efficiency rather than new kilns: waste-heat recovery, alternative fuels and co-processing (Chip Mong Insee and Siam City already run a waste-to-fuel facility) and grinding upgrades.
- Building-materials exporters from Vietnam, Thailand and China still have room in steel, tiles, glass and fittings, but should price against a market where project starts are slower than permits suggest.
- Investors should treat new clinker capacity with caution until the domestic surplus is absorbed; downstream ready-mix, precast and distribution look better placed.
- Contractors and developers benefit from cheaper local cement, but should watch how the tax incentive debate and any consolidation affect prices after 2028.
For related views, see our reports on the Cambodia Packaging Market, Construction in Indonesia and the Vietnam Industrial Park Market.
Key Questions Answered in the Full Report
- How much cement will Cambodia consume each year from 2027 to 2032, by end-use segment?
- When does demand catch up with the ~11 Mt of installed capacity, and what does that mean for utilisation and prices?
- Who owns each plant, how much capacity do they have, and how is ownership shifting between Thai and Chinese groups?
- How much cement and steel will Techo Airport, the Funan Techo Canal and the expressway programme need?
- Which building materials are still imported, from where, and where are the supply gaps?
- What are the bear, base and bull forecasts for cement demand, capacity and prices to 2032?
Cambodia Cement and Building Materials Market 2027-2032: Kampot Capacity, Chinese Investors and Construction Recovery Executive Summary
The three slides below summarise the full report. The complete 44-slide version, with the outlook to 2032, regulation, value chain and producer profiles, is available on request.
- From 100% imports to self-sufficiency in under two decades.
- Capacity now runs ahead of domestic demand.
- Prices drifted lower as new kilns arrived.
- Four of six plants sit in Kampot's limestone belt.
- New capacity moves closer to Phnom Penh and the north-east.
- Tax incentives extended to end-2028.
- Permits recovered faster than construction output.
- Public works and factories lead demand growth.
- Downstream ready-mix and precast gain share.
Report Preview
What the Full Report Includes
- Cement capacity, output, consumption, utilisation and trade, 2019-2025 and 2026 estimate
- Plant-by-plant capacity and ownership table, including licensed projects
- Construction approvals, output and demand by end-use segment
- Building-materials imports: steel, tiles, glass, aluminium and fittings
- Regulation: tax incentives, licensing, mining and environment, Law on Investment
- Cement production process, cost build-up, supply chain and value chain
- Porter's Five Forces and key mega trends
- Drivers, restraints and impact assessment
- Profiles: Kampot Cement (SCG), Chip Mong Insee, Conch KT / Battambang Conch, Thai Boon Roong, Chakrey Ting
- Bear, base and bull forecasts to 2032 for demand, capacity and prices