Australia Battery Energy Storage Market 2027-2032: Grid-Scale Pipeline, CIS Tenders and Revenue Stacking
Market Overview
Five years ago Australia's National Electricity Market (NEM) had just five utility-scale batteries with a combined 261 MW, and most of them earned their money from frequency control services rather than trading energy (Australian Energy Regulator). The picture today is very different. The Clean Energy Council (CEC) says Australia became the world's third-largest utility-scale battery market in 2026, behind only the US and China, after 4.3 GW of large batteries reached financial close in 2025.
Construction has followed. Eleven storage projects totalling 1.9 GW / 4.9 GWh were commissioned in 2025, as much as in the previous eight years combined, and a further 2.3 GW / 7.1 GWh came online in the first half of 2026. Between mid-2025 and mid-2026, AEMO recorded 4,640 MW / 12,353 MWh of batteries starting to commission in the NEM, and total grid-scale battery output passed 9,000 MW for the first time in the June 2026 quarter.
| Indicator | Value | Source |
|---|---|---|
| Storage at financial close or under construction (Jun 2026) | 12.6 GW / ~35 GWh | CEC |
| Storage projects reaching financial close, H1 2026 | 13 projects, 1.6 GW / 6.5 GWh | CEC |
| Standalone batteries in NEM connection pipeline (Q1 2026) | 33.2 GW (up from 20.5 GW) | AEMO Connections Scorecard |
| Share of NEM battery pipeline with grid-forming inverters | ~74% | AEMO via Energy-Storage.news |
| Grid-scale battery capex market, 2026E | A$X.XB | ████ |
| Operating grid-scale capacity, end-2026E | XX GW / XX GWh | ████ |
| Installed capacity, 2032 base case | XX GW / XX GWh | ████ |
The headline pipeline numbers need care. AEMO's connection queue counts projects that may never be built: the Clean Energy Regulator's May 2026 data showed a probable queue of 32 GW but a committed queue of only 7.3 GW. The draft 2026 Integrated System Plan (ISP) estimates the NEM needs roughly 35 GW of short- and medium-duration storage by 2050, and about 45 GW of grid-scale storage was already in the connections process at the start of 2026. The constraint is no longer interest from developers; it is turning that interest into financed, connected projects.
The Big Projects
Australian batteries have grown quickly in size as well as number. The 150 MW Hornsdale Power Reserve was the world's largest lithium-ion battery when it opened in South Australia in 2017. Today several Australian projects store more than ten times as much energy, and most new projects are built for four hours or more.
| Project | Owner | Size | Status, late 2026 |
|---|---|---|---|
| Collie Battery (WA) | Synergy (state-owned) | 500 MW / 2,400 MWh | Completed Feb 2026; largest operating in Australia |
| Collie Battery (WA) | Neoen | 560 MW / 2,240 MWh | Operating |
| Eraring Battery stage 1 (NSW) | Origin Energy | 460 MW / 1,770 MWh | Commissioned Jan 2026; later stages under way |
| Waratah Super Battery (NSW) | Akaysha Energy | 850 MW / 1,680 MWh | Commissioning, about 12 months late |
| Orana BESS (NSW) | Akaysha Energy | 415 MW / 1,660 MWh | Commercial operations 26 Jun 2026 |
| Liddell BESS (NSW) | AGL Energy | 500 MW / 1,000 MWh | Fully operational |
| Western Downs expansion (Qld) | Neoen | Expanding to ~2,300 MWh | Under construction |
| Other top-15 projects | ██████ | ██████ | ██████ |
Two patterns stand out. First, many of the largest batteries sit on the sites of retiring coal plants, such as Eraring, Liddell and Collie, where grid connections and transmission already exist. Second, ownership is spread between gentailers (AGL, Origin, EnergyAustralia through contracts), state-owned utilities (Synergy) and specialist developers backed by global capital, such as BlackRock-backed Akaysha and Brookfield-owned Neoen.
Capacity Investment Scheme: The Government as Underwriter
The federal Capacity Investment Scheme (CIS) is the main policy driver. It runs competitive tenders and gives winners Capacity Investment Scheme Agreements (CISAs), which set a revenue floor and ceiling: the government tops up revenue if it falls below the floor and shares in revenue above the ceiling. This reduces merchant risk without fixing the price of every megawatt-hour.
| CIS tender | Market | Battery outcome | Announced |
|---|---|---|---|
| Tender 3 (dispatchable) | NEM | 4.13 GW / 15.37 GWh (all standalone batteries) | Sep 2025 |
| Tender 4 (generation) | NEM | 11.4 GWh of solar-plus-storage | Oct 2025 |
| Tenders 5 and 6 | WA (WEM) | 3.68 GWh of storage (standalone and hybrid) | May 2026 |
| Tender 7 (generation) | NEM | 2 GW / 7.9 GWh co-located storage | May 2026 |
| Tender 8 (dispatchable) | NEM | 4.2 GW / 16.1 GWh, 15 standalone batteries | Jun 2026 |
| Tender 10 (dispatchable) | NEM | Targeting 4 GW / 16 GWh | ████ |
Demand for contracts is strong. Tender 3 drew 124 bids totalling about 34 GW / 135 GWh, an oversubscription of more than eight to one, and Tender 8 bids exceeded the target by almost five to one. Tender 8 was technology-neutral, yet every winner was a lithium-ion battery rather than pumped hydro or another long-duration technology, which says a lot about current costs and build times.
Delivery is the weak point. Modo Energy calculates that only 1.8 GW of the 17.5 GW awarded across all CIS rounds had reached a final investment decision by mid-2026, fewer than one in ten battery winners. Connection delays, equipment lead times, financing terms and the falling value of merchant revenue all play a part. Tender 9 rule changes put more weight on deliverability, and Tender 10 may be the last NEM dispatchable round.
How Big Batteries Make Money
Australia's energy-only market, with its five-minute settlement and high price cap, is often described as a market made for batteries. Revenue comes from three main places in the physical market: energy arbitrage (charging when prices are low, usually at midday, and discharging into the evening peak), frequency control ancillary services (FCAS), and smaller frequency performance payments. On top of that, many projects earn contracted income from CIS agreements, state-level Long-Term Energy Service Agreements (LTESAs) in New South Wales, network support or system strength contracts, and tolling or virtual tolling agreements with retailers.
| NEM battery fleet revenue | Q1 2026 | Q2 2026 | Q3 2026 |
|---|---|---|---|
| Energy arbitrage (net or gross, as reported) | A$93.9M (97% of total) | A$52.8M net (−56% y/y) | ~A$86M (97% of total) |
| FCAS | A$3.0M (−43% y/y) | A$4.8M (−51% y/y) | ~A$1.8M (2%) |
| Total estimated market revenue | ~A$96.9M | ~A$58M | A$88.9M |
| Revenue per MW installed | ████ | ████ | ████ |
The trend is clear: FCAS, which paid for the first generation of Australian batteries, has been saturated by the fleet's growth, and arbitrage now delivers nearly all market revenue. Arbitrage itself is getting harder. AEMO reports NEM-wide battery price spreads fell 85% in a year to an average A$51/MWh in Q2 2026, as more batteries compete for the same evening peaks and home batteries reduce evening demand. NEM wholesale prices averaged A$74/MWh in Q2 2026, down 47% year on year and the lowest second quarter since 2020.
Revenue is also concentrated. NEMPulse found that five days delivered 15% of the fleet's Q3 2026 revenue, and that the fleet captured only 32-54% of what a perfect-foresight strategy would have earned in recent months. That gap is why trading software, optimisation services and contract structures matter so much to returns.
- Merchant arbitrage: still the main market income, but spreads are shrinking as the fleet grows.
- FCAS: below 10% of revenue for most assets; still valuable in local constraints, such as South Australia.
- CIS and LTESA underwriting: floors and ceilings that make debt financing easier.
- Tolling and virtual tolling: retailers such as EnergyAustralia and Engie pay fixed fees for access to battery capacity, as at Orana and Neoen's projects.
- System strength and grid services: grid-forming inverters let batteries provide inertia-like services that coal and gas plants used to supply.
Home Batteries: The Other Half of the Market
Utility-scale projects are only part of the story. The federal Cheaper Home Batteries Program, which started in July 2025 and cuts upfront battery costs by about 30% through small-scale technology certificates, has grown much faster than expected. More than 400,000 systems with 11.2 GWh of capacity were installed in under a year, and the program passed 600,000 systems by late 2026. In the 12 months to March 2026, home batteries added about as much energy capacity as grid-scale projects did.
| Home battery indicator | Value | Source |
|---|---|---|
| Installations under the program (Sep 2026) | >600,000 (~16.8 GWh est.) | Minister Bowen; Energy-Storage.news estimate |
| Program funding | ~A$7.2B over four years (from A$2.3B) | Clean Energy Regulator |
| Program target | ~40 GWh by 2030, >2 million batteries | DCCEEW |
| Tiered rebates by battery size | From 1 May 2026 | Clean Energy Regulator |
| Home battery revenue pool and VPP share | ████ | ████ |
For grid-scale owners this is a double-edged development. Home batteries soak up rooftop solar and supply households in the evening, which reduces the very peaks big batteries rely on. AEMO lists home battery growth as one of the reasons wholesale prices fell in 2026. On the other hand, virtual power plants that aggregate home batteries remain small players in the market; NEMPulse tracked VPPs earning only about A$13,000 of FCAS revenue in June 2026.
Supply Chain and Costs
Almost all grid-scale cells and most integrated systems are imported. Tesla Megapacks are used at Neoen's Collie and Akaysha's Orana and Brendale; CATL supplies Synergy's Collie project; Powin, Fluence, WΓ€rtsilΓ€, Sungrow and others supply many more. Lithium iron phosphate (LFP) chemistry dominates, and falling cell prices have cut capital costs sharply since 2023, which is one reason four-hour batteries have overtaken pumped hydro in tenders.
Local value comes from development, grid connection, civil works, balance of plant, operations and trading. That is where Australian contractors, engineering firms and software providers compete. Australia's own lithium sits upstream of this chain; for the processing side of that story, see our Australia Critical Minerals Processing Market review.
| Cost component | Typical share of capex | Who supplies |
|---|---|---|
| Battery system (cells, racks, PCS) | ~55-65% | Tesla, CATL, Fluence, Sungrow, WΓ€rtsilΓ€, Powin |
| Grid connection and substation | ~10-15% | Transmission companies, EPCs |
| Balance of plant and civil works | ~10-15% | Local EPCs (UGL, Genus, Acciona etc.) |
| Development, finance and owner costs | ~8-12% | Developers, banks |
| Installed cost per MWh, 4-hour project, 2026E | A$XXXk | ████ |
What This Means for Developers, Investors and Suppliers
- Developers: winning a CIS contract is no longer enough; connection progress, equipment slots and offtake structure decide whether a project gets built.
- Investors and lenders: merchant arbitrage alone is becoming thinner; floors from CIS or LTESA contracts and tolling agreements carry more weight in valuations.
- Equipment suppliers: four-hour and longer systems, grid-forming inverters and strong local service teams are now baseline requirements.
- Retailers: virtual tolling lets them use battery capacity without owning assets, as EnergyAustralia does at Orana.
- Asian partners: Australia is a test market for long-duration batteries and grid-forming technology that other Asia-Pacific grids will follow.
For related battery coverage in the region, see our China Sodium-Ion Battery Market review.
Key Questions Answered in the Full Report
- How much grid-scale storage will Australia have operating by 2032?
- How many CIS winners will reach financial close, and when?
- How will battery revenue per MW change as spreads narrow?
- Which revenue stacks (tolling, CIS, system strength, merchant) work best?
- Who leads the market and how will shares change?
- What are the bear, base and bull forecasts for 2027-2032?
Australia Battery Energy Storage Market 2027-2032: Grid-Scale Pipeline, CIS Tenders and Revenue Stacking Executive Summary
The three slides below summarise the full report. The complete 42-slide version, with the outlook to 2032, regulation, value chain and company profiles, is available as a PDF.
- Australia is the third-largest grid-scale market.
- Four-hour batteries dominate new builds.
- Home batteries grow just as fast.
- CIS floors and ceilings reduce risk.
- Few winners have reached FID.
- Deliverability now matters more.
- FCAS is saturated.
- Arbitrage is getting thinner.
- Tolling and grid services grow.
Report Preview
What the Full Report Includes
- Australian grid-scale battery capacity and capex, 2023-2025 and 2026 estimate
- Capacity by state, duration and ownership
- CIS tenders, LTESAs and state schemes
- Revenue streams: arbitrage, FCAS, tolling, system strength
- Home batteries and VPPs
- Supply chain, costs and value chain
- Porter's Five Forces and key mega trends
- Drivers, restraints and impact assessment
- Market landscape and shares
- Profiles of Neoen, Akaysha Energy, Origin Energy, AGL Energy and Synergy
- Bear, base and bull forecasts to 2032